Turnkey Pump Station Installation are assessed around the pumped liquid, chamber type, pump duty, controls, alarms, floats, valves, rising main, ground conditions and access for future maintenance.
What turnkey pump station installation are used for
Turnkey pump station installation combines pump equipment, controls, alarms, chamber installation, drainage connections, rising main works and commissioning where the project requires a joined-up route.
Selection and site considerations
The key is separating the technical pumping scope from the civil construction scope while keeping both coordinated. Pump choice, chamber size, access covers, electrical supply, control panel, alarms, pipework, valves, concrete bases, backfill and reinstatement all need to be aligned.
Repair, replacement and maintenance considerations
The correct approach depends on the age of the chamber, pump duty, condition of floats, valves, non-return valves, guide rails, control panel, alarms, rising main and access. Alton Pumps can support the pumping equipment and Alton Facility Services can support civils where excavation, chambers, pipework or reinstatement are required.
What to send before attendance
Useful information includes the site postcode, photographs of the chamber and control panel, pump model plates, alarm status, inlet depth if known, rising main route, discharge point, access restrictions, and whether the system handles foul sewage, grey water, surface water, rainwater or commercial wastewater.
How we can help
- Complete package pump station route
- Pumps and controls by Alton Pumps
- Civil installation support by Alton Facility Services
- Commissioning and handover
- New build and replacement stations
