Sewage Pump Stations by Alton Pumps

Pump Station Control Panels & Alarms

Support for sewage pump station controls, alarms, float switches, duty/standby operation and panel upgrades.

Pump Station Control Panels & Alarms
Practical answer

Pump Station Control Panels & Alarms support is handled around the actual pump station arrangement: chamber type, pumped material, pump duty, controls, alarms, valves, rising main, access, ground conditions and whether the work is repair, servicing, refurbishment, replacement or new installation.

Control panels are the brain of the pump station

A pump station can have good pumps and still fail if the control system is unreliable. Float switches, level sensors, overloads, contactors, starters, alarms, telemetry and duty/standby sequencing all affect reliability.

Common panel and alarm problems

Typical issues include high level alarms not warning anyone, pumps failing to alternate, floats becoming tangled or fouled, overloads tripping, failed contactors, corroded enclosures, poor labelling and panels that do not match the current pump arrangement.

  • High level alarm faults
  • Float switch failures
  • Pump overload trips
  • Duty/standby control issues
  • Panel replacement or upgrade
  • Remote alarm and telemetry advice

Upgrading controls during refurbishment

When a pump station is refurbished, it is often sensible to review the control panel and alarm arrangement at the same time. A new pump with an old unreliable panel can leave the site exposed to repeat faults.

How we can help

  • Control panel fault finding
  • Alarm testing and upgrades
  • Float switch replacement
  • Duty/standby controls
  • Telemetry options
Published project evidence

Relevant pump station work

Selected, non-identifying examples from project records already published by Alton Pumps or Alton Facility Services. Details are limited to the recorded site type, broad location, work and outcome.

Alton PumpsTwin foul-water stationHampshireCompleted January 2026

Twin-pump and control-panel upgrade

A Hampshire twin foul-water station received a coordinated pump and control-panel upgrade.

Work recorded
Alton Pumps installed two new 230V foul pumps in the wet well and a new 230V twin-pump control panel in the existing site enclosure.
Check and outcome
The two pumps and control panel were tested together and recorded as working at handover. No flow, head, energy or reliability improvement is claimed.

Frequently asked questions

Can you replace a pump station control panel?

Yes. We can review the existing pump arrangement, supply details and control requirements before advising on a suitable panel replacement or upgrade.

Why does the pump station alarm keep sounding?

A repeated alarm may indicate high level, float failure, pump failure, blocked pump, valve issue, electrical trip or control panel fault. It should be investigated rather than ignored.