Developer Sewage Pump Stations support is handled around the actual pump station arrangement: chamber type, pumped material, pump duty, controls, alarms, valves, rising main, access, ground conditions and whether the work is repair, servicing, refurbishment, replacement or new installation.
Developer pump stations need early design coordination
Developer pump station projects need coordination between drainage design, pump selection, chamber installation, electrical controls, rising mains, access and adoption or handover requirements. Waiting until late in the build often causes avoidable changes.
Pumping equipment and civil installation
Alton Pumps can deal with pump station equipment, pumps, controls, valves, commissioning and support. Alton Facility Services can support the civil installation where required, including excavation, chamber setting, drainage pipework, rising main trenching and reinstatement.
Systems covered
Developer projects can involve package pump stations, GRP chambers, thick wall HDPE chambers, high water table installations, concrete ring chambers, adoptable pump stations, surface water pump stations and foul sewage pump stations.
- Private foul sewage pump stations
- Adoptable or potentially adoptable pump stations
- Surface water and storm water pump stations
- Package pump stations for multiple plots
- Rising main and valve chamber support
- Section 104 / adoption links where needed
How we can help
- new build developments
- small sites and multiple plots
- S104 and non-adoptable schemes
- drawings and specification review
- pump station installation and commissioning
