Pump Station Commissioning support is handled around the actual pump station arrangement: chamber type, pumped material, pump duty, controls, alarms, valves, rising main, access, ground conditions and whether the work is repair, servicing, refurbishment, replacement or new installation.
Commissioning protects the installation
Commissioning checks that pumps run in the correct sequence, floats or level controls operate properly, alarms activate, valves function, pipework is secure and the control panel matches the installed equipment.
Typical commissioning checks
Checks may include pump rotation, manual and auto operation, high level alarm activation, duty/standby alternation, float settings, valve operation, leaks, panel labelling, overload settings and handover notes.
- Pump operation checks
- Float and high level alarm checks
- Duty/standby sequencing
- Valve and pipework checks
- Control panel checks
- Maintenance recommendations
After commissioning
Once commissioned, planned maintenance should be put in place to protect the equipment and identify developing issues before they become breakdowns.